Working direct with Stepnell Construction, this project comprised a full architecture commission through a contractor led design and build process, to develop detailed design proposals from an outline site master plan provided by the user client team.


Requiring the design and production of standardised and verified construction information through a structured design process and construction stages with production of full construction information.


The office buildings comprise three two storey office blocks with open plan shell and core layouts. Along with the provision of new car park areas and road layout.


The refurbished building on the site was undertaken by Stepnell with another design team separately.


The new building phase 2 is completed on site with the remaining buildings to be developed in phases.


The interior finishes design, carpets, paint colours, and wall finishes and furniture selection was undertaken by other interior design consultants commissioned direct by the user client.


Private Office Park Development

Moss Architecture .

Interiors Ltd

Profile

Contact

Projects